How much power Nevada's data centers say they need, stacked up against how much the tracked energy projects would actually generate: filterable by status and project type.

Filter by status

Filter by energy project type

Data center demand

9,455.45 MW

29 sites in filter · 6 without a reported figure

Energy project generation

21,575.4 MW

Solar, geothermal, gas & battery storage combined

Substation capacity

1,060 MVA

Transmission/transformer capacity, not generation

Battery storage capacity

29,055 MWh

Total energy stored, not a discharge rate (MW)

Demand vs. generation, at a glance

Data centers9,455.45 MW
Energy projects (generation)21,575.4 MW

Energy project generation by type

Substation6 projects786 MW
Solar34 projects13,476.2 MW
Geothermal29 projects652.5 MW
Gas12 projects6,278.7 MW
Pipeline3 projects0 MW
Battery Storage5 projects230 MW
Wind1 project152 MW
TypeProjectsGeneration (MW)Substation (MVA)Storage (MWh)Missing data
Substation6786560—3
Solar3413,476.250023,7755
Geothermal29652.5——15
Gas126,278.7——3
Pipeline3———3
Battery Storage5230—5,2802
Wind1152———
Total (90)9021,575.41,06029,055

Data centers by status

StatusSitesDemand (MW)Missing data
Proposed41,0003
Approved75,6251
Under Construction121,5422
Operational61,288.45—
Cancelled0——
Total (29)299,455.45

Totals only include entries that pass the filters above and have a reported figure: see the data center tracker and energy project tracker to fill in what's missing.