All Is On

Power Totals

How much power Nevada's data centers say they need, stacked up against how much the tracked energy projects would actually generate: filterable by status and project type.

Filter by status

Filter by energy project type

Data center demand

10,050.08 MW

21 sites in filter · 2 without a reported figure

Energy project generation

9,765.2 MW

Solar, geothermal, gas & battery storage combined

Substation capacity

1,060 MVA

Transmission/transformer capacity, not generation

Battery storage capacity

4,800 MWh

Total energy stored, not a discharge rate (MW)

Demand vs. generation, at a glance

Data centers10,050.08 MW
Energy projects (generation)9,765.2 MW

Energy project generation by type

Substation6 projects786 MW
Solar16 projects6,015 MW
Geothermal24 projects523.5 MW
Gas5 projects2,440.7 MW
Pipeline3 projects0 MW
Battery Storage2 projects0 MW
TypeProjectsGeneration (MW)Substation (MVA)Storage (MWh)Missing data
Substation67865603
Solar166,0155002
Geothermal24523.513
Gas52,440.71
Pipeline33
Battery Storage24,8001
Total (56)569,765.21,0604,800

Data centers by status

StatusSitesDemand (MW)Missing data
Proposed11,000
Approved65,4551
Under Construction109671
Operational42,628.08
Cancelled0
Total (21)2110,050.08

Totals only include entries that pass the filters above and have a reported figure: see the data center tracker and energy project tracker to fill in what's missing.