Every tracked data center, ranked against every other one, by power draw, by land size, and by how power-hungry each site is per acre. Lined up next to each other, the differences in scale are hard to miss.
Filter by status
20 of 20 data centers in this filter
Compare two data centers
Pick any two tracked sites to see exactly how many times bigger one is than the other.
Power draw: Apple Sparks Campus (626 MW) is 39.1× larger than Colovore Data Center (RNO01) (16 MW).
Land footprint: not enough data to compare (at least one site is missing this figure).
Power density: not enough data to compare (at least one site is missing this figure).
Power draw
Ranked by requested/contracted power capacity, largest first.
- #2South Valley Tech ParkTract1,215 MW
- #3Monarch Data CenterCopia Power1,000 MW
- #18RNO1 (Centra)Centra0.08 MW
2 sites in this filter don't have a power figure reported and aren't shown above.
Land footprint
Ranked by site size, largest first.
- #1Virginia Highlands Technology ParkTract8,590 acres
- #2Switch: Citadel CampusSwitch2,000 acres
- #3South Valley Tech ParkTract1,534 acres
- #4Sapphire Technology ParkTract1,063 acres
- #5Peru Shelf Technology ParkTract686 acres
- #6Peru Ridge Technology ParkTract517 acres
- #7Monarch Data CenterCopia Power505 acres
- #11Novva Data CenterNovva20 acres
- #13Webb Data Center (RNO02)Colovore6.02 acres
- #14Keystone Data Center (RNO2)Centra2.1 acres
- #15RNO1 (Centra)Centra0.106 acres
5 sites in this filter don't have a land acreage figure reported and aren't shown above.
Power density
MW per acre: how power-hungry each site is relative to its footprint. High means a small site pulling a lot of power; low means a sprawling site that draws comparatively little.
- #2Keystone Data Center (RNO2)Centra5.71 MW/acre
- #3Webb Data Center (RNO02)Colovore4.98 MW/acre
- #5Novva Data CenterNovva3.00 MW/acre
- #6Monarch Data CenterCopia Power1.98 MW/acre
- #8Peru Shelf Technology ParkTract1.18 MW/acre
- #9South Valley Tech ParkTract0.79 MW/acre
- #10RNO1 (Centra)Centra0.76 MW/acre
- #11Oppidan 5MW Data CenterOppidan0.71 MW/acre
- #12Sapphire Technology ParkTract0.66 MW/acre
- #13Peru Ridge Technology ParkTract0.44 MW/acre
- #14Switch: Citadel CampusSwitch0.33 MW/acre
- #15Virginia Highlands Technology ParkTract0.29 MW/acre
5 sites in this filter don't have both a power and acreage figure reported and aren't shown above.